Eneria doubles the available emergency standby power of EPC
29
September

- Customer: Eco Printing Center
- Location: Lokeren, Belgium
- Equipment: 2 x CAT 3512B HD – 1,750 kVA
Eco Printing Center (www.epc-nv.be), the printing company of De Persgroep is one of the most modern and ecological of its kind in Europe. By adding a new CAT 3512B HD emergency generator to the identical existing machine, the total emergency standby power of EPC grew to 3.5 MVA.
top