• Eneria, N°1 player in the energy industry. Wherever you are – Follow our news.

Eneria doubles the available emergency standby power of EPC

  • Customer: Eco Printing Center
  • Location: Lokeren, Belgium
  • Equipment: 2 x CAT 3512B HD – 1,750 kVA

Eco Printing Center (www.epc-nv.be), the printing company of De Persgroep is one of the most modern and ecological of its kind in Europe. By adding a new CAT 3512B HD emergency generator to the identical existing machine, the total emergency standby power of EPC grew to 3.5 MVA.

top